- Site and equipment group
- Record site code, service area, accessory brand, model and generation where available. Group sites only when the relevant configuration is known to match. A shared photograph or a generic description such as multifold dispenser is insufficient evidence that every installation behaves the same.
- Current and proposed references
- Keep the original buyer SKU, approved sample reference and supplier product reference beside the proposed replacement. Record fold or roll format, dimensions, ply, count and pack configuration separately. Mark fields reported by the supplier and fields checked at the site so the comparison stays auditable.
- Physical trial outcome
- Record installation, first dispensing, later dispensing, refill handling and any observed exception. Name the equipment and sample actually tested. Agree the duration and scope with the site owner; do not convert one successful installation into an unsupported network-wide pass.
- Permission and expiry
- Use explicit states such as approved for listed sites, conditional, pending or rejected. Add authorized quantity or period where the substitute is temporary, responsible approver and unresolved conditions. Keep the authorization linked to the exact replacement version rather than its informal sales name.